Skip to end of metadata
Go to start of metadata

You are viewing an old version of this content. View the current version.

Compare with Current View Version History

Version 1 Next »

Mobi Timesheet

Like any timesheet, the timesheet in Mobi allows you to add the hours you and your crew worked on the job. 


https://youtu.be/MZ-y6Lh4RNQ

How to Fill Out a Mobi Timesheet

  1. First, navigate to the Timesheet screen. It is possible to access the Timesheet screen from within a specific job, or from the Jobs screen. Typically, you will be entering your hours as a final step in the general workflow of completing a job from in the Today menu.  

  2. Add resources or edit hours as required.   

  3. Once you have selected the relevant resource, you can enter today’s start time, break time, finish time, and actual hours. 

    Note: If you would like to adjust the default 15-minute increments, read the instructions below to edit this setting.

  4. Once you have synced your information from Mobi back into your Moveware database by using the Mobi Sync function, the information entered into the timesheet will appear in the Dispatch Diary, under the Resources section and allocated to the relevant resource.  


How to Adjust Time Increments in Moveware

Step 1: Navigate to Administration > Company Set up

Step 2: Select Mobi to open Mobi Menu

Step 3: Select the user group for which you want to adjust the setting

Step 4: Select Setting

Step 5: Search for Timesheet Interval setting

Step 6: The value column will show the current setting. Double clicking this will toggle through the options and update the setting.

Note: Different times can be set for each user by following the same method but accessing the setting through Employee Management > Groups instead.


How to Adjust Time Increments in Mobi

Important note: You must set this to a NON “Admin Only” setting. Refer to https://wiki.moveconnect.com/docs/moveware/configure-mobi-settings/ for how this can be done.

Step 1: Select Global Menu Icon

Step 2: Open settings

Step 3: Search for Timesheet Interval setting

Step 4: Tap on Timesheet interval value

Step 5: Select desired setting


Hire Labour Timesheeting in Mobi:

To enable Hire Labour Timesheeting in Mobi, make sure the Mobi Setting “Show Labour Quantity in Summary” is set to Yes.

This will show the Labour quantity on the Time-sheeting and summary screen:

These Quantities are editable from the “Edit” button:


Handy Moveware System Parameter:

By default- the format of the Timesheeting hours in Moveware are displayed by fractions of full hours. For example 3:25 represents 3 hours and 15 minutes. This keeps the resource calculations simple but it can be somewhat confusing for dispatchers to see. Therefore a system parameter can be set to update the display of these hours to hours and minutes. I.e. 3:15 represents 3 hours and 15 minutes. Please note- the resources tab will remain unchanged to cater for rate calculations- i.e. the resources tab will still show 3.25.

  • No labels